{"id":175622,"date":"2023-05-29T20:29:56","date_gmt":"2023-05-30T03:29:56","guid":{"rendered":"https:\/\/inbusinessphx.com\/?p=175622"},"modified":"2023-05-29T20:29:56","modified_gmt":"2023-05-30T03:29:56","slug":"empire-101-is-new-infill-class-a-industrial-project-in-peoria","status":"publish","type":"post","link":"https:\/\/staging.inbusinessphx.com\/?p=175622","title":{"rendered":"Empire 101 Is New Infill, Class-A Industrial Project in Peoria"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-large wp-image-175623\" src=\"http:\/\/inbusinessphx.com\/wp-content\/uploads\/2023\/05\/SLC-KBC_Empire-101-1024x597.png\" alt=\"\" width=\"610\" height=\"356\" \/>On behalf of <a href=\"http:\/\/kbcadvisors.com\" target=\"_blank\" rel=\"noopener\">KBC Advisors Arizona<\/a>, Phoenix-based <a href=\"http:\/\/stevensleinweber.com\" target=\"_blank\" rel=\"noopener\">Stevens-Leinweber Construction<\/a> has started construction on Empire 101, a 152,134-square-foot Class A industrial project fronting the Loop 101 freeway, at 89th\u00a0Avenue and Sweetwater Road in Peoria, Arizona. Completion is expected in January 2024.<\/p>\n<p>Located just 12 minutes from the new TSMC semiconductor Fab plant and with access to almost 2.5 million residents within a 30-minute drive, Empire 101 represents a significant infill site selection opportunity for industrial tenants seeking strategic space in the metro Phoenix market. The site can park 144 automobiles, expandable to more than 200 total spaces.<\/p>\n<p>Stevens-Leinweber Construction serves as Empire 101\u2019s general contractor. Deutsch Architecture is the architect. Mike Ciosek and Eric Bell of Kidder Mathews are the building\u2019s exclusive leasing brokers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On behalf of KBC Advisors Arizona, Phoenix-based Stevens-Leinweber Construction has started construction on Empire 101, a 152,134-square-foot Class A industrial project fronting the Loop 101 freeway, at 89th\u00a0Avenue and Sweetwater Road in Peoria, Arizona. Completion is expected in January 2024. Located just 12 minutes from the new TSMC semiconductor Fab plant and with access to [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":175623,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","footnotes":""},"categories":[8],"tags":[36],"class_list":["post-175622","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-commercial-real-estate","tag-get-real"],"_links":{"self":[{"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=\/wp\/v2\/posts\/175622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=175622"}],"version-history":[{"count":0,"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=\/wp\/v2\/posts\/175622\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=175622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=175622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging.inbusinessphx.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=175622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}